This DVD is a double
disk
volume in a series of videos being developed to cover the entire build
process for the CH750 CruZer kit. How we Built our CruZer Tail is a great starting
place to begin your project – there are no prerequisite
assemblies that need to be completed before starting. To get started,
you only need a legal set of plans for the aircraft and at least the
tail sub
kit from Zenith. These TAIL DVDs take you from the
very beginning steps of assembling the rudder, stabilizer and elevator sections
of the aircraft's tail. The pictures on this page were captured from the actual
video footage in order to show the scope of construction provided in
this video volume.
Because the Cruzer Tail is often the first
section of the aircraft to be built, a chapter in this DVD series is
devoted to the beginning builder. This chapter
demonstrates the use of tools and techniques useful for successful
building of the entire CruZer aircraft. specifics include working with
metal, riveting, and plans reading. This DVD set is perfect for the
first time builder! Watching this DVD is the next best thing to
attending a builder's workshop!
Note: This production is not
associated or endorsed by Zenith Aircraft. It does not replace or
supersede the documentation provided with the kit. It is meant to
be an aid in building the aircraft and its methods are presented only as
a suggestion to builders.
This affordable 2 disk DVD video is approximately
3
hours in length and is divided into various video chapters to make
navigation and review of desired sections fast and easy The $45 price includes handling
and first class
postage (US). (International orders welcome)
$45.00 Includes
First class shipping
You can use your credit card by
pressing the ADD to CART button below (uses secure encrypted connection)
OR you can send a check for
$45 to:
HomebuiltHELP
Box 111
Brussels, WI 54204
We ship same
day we receive your check!
OR
If
you want to pay by credit card but not online, then
email us at
support@HomebuiltHelp.com with your phone number
and best time to call and we can complete the
transaction on the phone
|

Stabilizer ready for
skinning

Installing tips

Elevator horn assembly

Servo installation

Stab and Elevator united
|

Taking parts inventory before starting

Riveting rudder hinge

Installing skin onto skeleton

Installing rudder horn

Stabilizer rib installation

Installing skin on stabilizer

Elevator rib placement

Trim servo assembly

Rudder ready for riveting
click for
sample Video snippet |