This DVD title is a double
disk
volume in a series of videos covering the entire build
process for the CH750 CruZer kit. FINISHING is
the final installment of the building process. It begins with mounting
the horizontal tail: stabilizer, elevator, vertical fin and rudder. We
demonstrate the construction of the pulleys and control cables for the
tail. Balancing the elevator is shown, along with checking the travel
motion required by the rudder and elevator. Next, the panel is installed
along with the top skin, followed by rigging the wings and flaperons.
Suggestions for fuel and wire routing are shown, although these will vary
based on engine and panel requirements of the builder. The pictures on this page were captured from the actual
video footage in order to show the scope of construction provided in
this video volume.
Note: This production is not
associated or endorsed by Zenith Aircraft. It does not replace or
supersede the documentation provided with the kit. It is meant to
be an aid in building the aircraft and its methods are presented only as
a suggestion to builders.
This affordable 2 disk DVD video is approximately
3.75
hours in length and is divided into various video chapters to make
navigation and review of desired sections fast and easy The $45 price includes handling
and first class
US postage. (International orders welcome)
$45.00 Includes
First class shipping
You can use your credit card by
pressing the ADD to CART button below (uses secure encrypted connection)
OR you can send a check for
$45 to:
HomebuiltHELP
Box 111
Brussels, WI 54204
We ship same
day we receive your check!
OR
If
you want to pay by credit card but not online, then
email us at
support@HomebuiltHelp.com with your phone number
and best time to call and we can complete the
transaction on the phone
|

Elevator weights and balancing

Optional sliding seat mechanism install

Windshield installation

Wing rigging procedures

Lower Strut fitting

Cutting struts to length

Drilling
Flaperon
mounting

Gascolator installation
|

Installing and leveling horizontal tail

Leveling prior to drilling

Fin construction

Trial fit of rudder fin

Pulley and cable construction

Elevator Cable attach and routing

Optional center console contruction

Drilling windshield mounting holes

Setting Wing dihedral

Strut fitting installation

Mass weight trimming and balancing

sample panel layout
|