$40 (includes Shipping)
Press to Purchase


Building your Zenith CH701
Wing Construction

A step by step video guide for builders of the popular Zenith CH701 aircraft kit.

Return to Build Videos

This double set (2 DVDs) is a single volume in a series of videos being developed to cover the entire build process for the CH701 kit. WING CONSTRUCTION is meant to follow the building progress where the  Horizontal Tail or Forward Fuselage volume left off.   

Note: This production is not associated or endorsed by Zenith Aircraft. It does not replace or supersede the documentation provided with the kit.  It is meant to be an aid in building the aircraft and its methods are presented only as a suggestion to builders.

This affordable double DVD video is approximately 5 hours in length .  The $40 price includes handling and first class postage. (International orders welcome, air mail postage included!)

$40.00  Includes First class shipping

You can use your credit card by pressing the ADD to CART button below (uses secure encrypted connection)

 OR you can send a check for $40 to:

HomebuiltHELP
Box 111
Brussels, WI 54204

We ship same day we receive your check!

OR

If you want to pay by credit card but not online, then email us at support@HomebuiltHelp.com with your phone number and best time to call and we can complete the transaction on the phone


 

 
                 Fuel sender install                                              Testing for leaks!

 


                   Fabricating wing tip                                          Fitting fiberglass tip


Building wing skeleton
 


Alignment technique for nose rib
 


Slat bracket jig procedure
 


Creating rear channel alignment template
 


Strut fitting fabrication & installation
 


Installing top wing skin



Drilling skin to spar
 


Layout of trailing edge cutouts
 


Installing flaperon bracket
 


Test fitting fuel tank
 


Nose skin installation


Straps for nose skin installation