$40 (includes Shipping US) |
A step by step video guide for builders of the popular Zenith CH701 aircraft kit. |
This double set (2 DVDs) is a single volume in a series of videos being developed to cover the entire build process for the CH701 kit. Horizontal Tail is meant to follow the building progress where the Metalworking101 (rudder) or Forward Fuselage volume left off. It is acceptable to have completed the construction of the rudder and/or fuselage for a seamless building strategy. Note: This production is not associated or endorsed by Zenith Aircraft. It does not replace or supersede the documentation provided with the kit. It is meant to be an aid in building the aircraft and its methods are presented only as a suggestion to builders. This affordable double DVD video is approximately 3.5 hours in length . The $40 price includes handling and first class postage US. (International orders welcome)
Trailing edge drilling Hinge alignment
|
|
|
|