$40 (includes Shipping US)
Press to Purchase


Building your Zenith CH701
Horizontal Tail

A step by step video guide for builders of the popular Zenith CH701 aircraft kit.

Return to Builder Videos

 This double set (2 DVDs) is a single volume in a series of videos being developed to cover the entire build process for the CH701 kit. Horizontal Tail  is meant to follow the building progress where the  Metalworking101 (rudder) or Forward Fuselage volume left off.  It is acceptable to have completed the construction of the rudder and/or fuselage for a seamless building strategy.   

Note: This production is not associated or endorsed by Zenith Aircraft. It does not replace or supersede the documentation provided with the kit.  It is meant to be an aid in building the aircraft and its methods are presented only as a suggestion to builders.

This affordable double DVD video is approximately 3.5 hours in length .  The $40 price includes handling and first class postage US. (International orders welcome)

$40.00  Includes First class shipping US

You can use your credit card by pressing the ADD to CART button below (uses secure encrypted connection)

 OR you can send a check for $40 to:

HomebuiltHELP
Box 111
Brussels, WI 54204

We ship same day we receive your check!

OR

If you want to pay by credit card but not online, then email us at support@HomebuiltHelp.com with your phone number and best time to call and we can complete the transaction on the phone


 

 
              Trailing edge drilling                                             Hinge alignment

 


                   Stab to Elevator fitting                                 Fitting on fuselage


Stabilizer skeleton construction
 


Bracket fabrication
 


Layout of rivet lines
 


Technique for bracket cutout in skin
 


Strap tie-down for skin fitting
 


Elevator skeleton assembly



Elevator skin
 


Layout of cutout
 


Cutout
 


Preparing trim controller


Hinge installation


Skin cutout trimming